Deliver, Position & Set To Work - Non Ground Floor - group B
- PLEASE NOTE ALL OF THE FOLLOWING:
- Non-ground floor
- Route through building must be sufficient for the dimensions of the unit being delivered
- Details of steps or stairs to be notified in advance
- Includes unpacking of unit and removal of packaging
- Includes plugging in of unit to a standard UK 3-pin socket within 2 metres
- All actions to be carried out during the initial delivery visit
- Does NOT include removal or disposal of any existing equipment
5 Day Lead Time
Customer is responsible for checking that the route through building is sufficient for the dimensions of the product being delivered. Installation services to non-ground floor site with clear access to the final installation position: no obstacles e.g. insufficiently wide or tall doorways, and product can be located without additional equipment or site modifications. Includes unpacking, removal of packaging, placement, installation of fittings, connection by 3 pin plug to a standard 230v supply within 2 metres and start up at the time of delivery. Please note: No electrical or plumbing work included. Installation & set to work deliveries not available on any 16/20 amp 1 phase and 3 phase products requiring electrical work, or any products requiring plumbing.
Product Specification |
|
Brand | Foster |
Type | Service Option |
More Info
There are currently no support materials available for this product. If you have a question about this product or need more information, please call our sales team on 03701 678 678 or Livechat with us now
Simply enter a value into the relevant section below and press enter to view converted values :