Deliver, Position & Set To Work - Ground Floor - group A
- PLEASE NOTE ALL OF THE FOLLOWING:
- Ground floor only
- Route through building must be sufficient for the dimensions of the unit being delivered
- No steps or stairs
- Includes unpacking of unit and removal of packaging
- Includes plugging in of unit to a standard UK 3-pin socket within 2 metres
- All actions to be carried out during the initial delivery visit
- Does NOT include removal or disposal of any existing equipment
5 Day Lead Time
Customer is responsible for checking that the route through building is sufficient for the dimensions of the product being delivered. Installation services based on ground floor site with clear access to the final installation position: no steps or stairs, no obstacles e.g. insufficiently wide or tall doorways, and product can be located without additional equipment or site modifications. Includes unpacking, removal of packaging, placement, installation of fittings, connection by 3 pin plug to a standard 230v supply within 2 metres and start up at the time of delivery. Please note: No electrical or plumbing work included. Installation & set to work deliveries not available on any 16/20 amp 1 phase and 3 phase products requiring electrical work, or any products requiring plumbing.
Product Specification |
|
Brand | Foster |
Type | Service Option |
More Info
There are currently no support materials available for this product. If you have a question about this product or need more information, please call our sales team on 03701 678 678 or Livechat with us now
Simply enter a value into the relevant section below and press enter to view converted values :